PROJECTS: SUGARLOAF HOSSTON PROJECT, TEXAS USA
(EME Interest between 6%-18%)
|

Above: Location of Sugarloaf Project
|
Empyrean signed the original farm-in agreement
with Houston based Texas Crude Energy Inc ("TCEI") on 6
April 2006. Although the Sugarloaf-1 well was successfully drilled
to a total depth of 20,896 ft, the primary objective reservoir,
the Hosston sandstones, proved to have insufficient permeability
to provide economic gas production.
However, significant gas shows and fluorescence
were encountered higher in the section in the secondary objective.
Electric log analysis indicated the presence of a 92 ft gross
column of gas in fractured limestones of the Austin Chalk.
The gas discoveries in this carbonate reservoir
had two immediate effects. Firstly, the operator increased the
land acquisition programme within the area of mutual interest
(which stood at approximately 19,500 acres in April 2007); and
secondly, it activated negotiations which resulted in the
conclusion of a second farm-in agreement between Empyrean and
TCEI.
This second agreement involved the division of the
prospective area into Blocks A and B and pertained only to the
next 16 wells to be drilled on Blocks A or B (subsequent to
Sugarloaf-1). TCEI remains the operator in Block B. A major oil
and gas company (name undisclosed for confidentiality purposes and
to protect competitive advantage) is the operator in Block A.
The operational momentum of Empyrean is manifest
in the increased working interest it has been able to negotiate
after consummating a second farm-in agreement with TCEI. This
second farm-in agreement is over an area divided into Blocks A and
B. Empyrean started with a 6% working interest in the whole of
Block B acreage, and subsequently drilled the Sugarloaf-1 well.
The additional farm-in covers the next 16 wells to be drilled on
either Block A or B, after Sugarloaf-1. The deal earns Empyrean a
7.5% working interest where these wells are drilled on Block A and
an additional 12% working interest where these wells are drilled
on Block B (i.e. the original 6% plus a further 12% resulting in
18%). Following the successful flow testing of two wells on Block
A, a drilling programme is being designed to appraise and develop
this exciting new field that has been named the Sugarkane Field.
BLOCK B
Remedial cementation was required prior to the
fraccing operations of the lower part of the gas-bearing chalk
interval in which there are at least three separate intervals of
enhanced porosity development. Testing operations began on 11
September 2007.
The first fracc attempt was unsuccessful due to
premature screen out of the proppant with only 6% entering the
formation; all of which required redesigning a second fracc
attempt which was executed on 19 October 2007.
Despite initial gas flows of 387mcfgpd with
associated condensate, the flow rate declined. Following the
completion of swabbing operations and the setting of production
tubing, the well was shut in until results from wells already
being drilled and tested in Block A could be used to modify the
continued testing programme of the remaining porous zones of the
Austin Chalk.
|

Above: Cross Section Block A & Block B |
This well was originally called Sugarloaf-2 and is the
second well to be spudded in the 16 well deal mentioned above.
It is located 1.6 km from Sugarloaf-1 well. The zone targeted in
the horizontal section of approximately 5,000 ft of Austin Chalk
reservoir is believed to correlate with the producing section in
the Sugarkane Field discovery well located 8 km to the west of
Kennedy-1H well.
Backround gas readings increased significantly
on entering the Austin Chalk.
The rig was released on 8 December 2007
following the emplacement of a 4 ½" liner in the
horizontal part of the well. On 15 February 2008 it was
announced that fraccing and testing procedures were necessarily
dependent on the results of the operations in the adjacent Block
A, and it was not until 16 April 2008 that Empyrean received
notification of the details of the final completion programme.
The fraccing operation was carried out on 14 May
2008. A total of 95,000 lbs of sand and 5182 barrels of fluid
were injected under pressure into four sets of perforations over
an approximate 600ft horizontal interval. Initial flow results
of gas condensate and fracc fluid recovery were announced on 25
May 2008, and since then the well has been slowly expelling the
fracc fluids prior to the measuring of full gas condensate flow.
The result is particularly relevant to the
overall prospectivity of the area as it has shown that the
so-called "middle pay zone" contains gas condensate
and could therefore add 150% to the recoverable reserves
attributed to the "upper pay zone".
As of 29 May 2008 the plan was to run pressure
gauges while the well was continuing to flow, then shut in the
well for a prolonged pressure build up. There still remained
approximately 4,120 barrels of fracc fluid to recover.
BLOCK A
TCEI JV Block A-1, a horizontal appraisal well,
was spudded on 22 May 2007. Two sidetrack operations were
required to get the well to total depth. A total depth of 14,586
ft (measured depth) was finally reached on 29 August 2007.
Gas shows were encountered over the whole
horizontal length of approximately 2,500 ft. Multiple gas flares
measuring up to 65' were recorded over approximately a 1,000 ft
horizontal length, including an interval of about 600 ft that
produced a constant gas flare.
A 4 ½" liner was cemented to 14,586 ft on
3 September 2007 which again was an operation not without its
problems. Fraccing and testing operations were put on hold until
the adjacent the TCEI JV Block A-2 well could be made available
for seismic monitoring purposes. This technique enables the
operator to determine the efficacy of the fracc operation at the
TCEI JV Block A-1 well. The first attempt to fracc on 13
December 2007 resulted in the fracc being unable to be injected
into the reservoir, as did a second attempt on 20 December 2007.
Sufficient injection rates required to fracc could not be
achieved without exceeding the 7" casing limitations, and
on 17 January 2008 Empyrean announced that 4½" casing was
being tied to the top of the liner and being run to surface to
enable higher injection pressures. Three further attempts to
pump the fracc sand to the reservoir under high pressure were
unsuccessful.
The operator made the decision to shut down the
well on 9 February 2008 and initiate a detailed reservoir
engineering post-mortem which includes a 3-D simulation study.
This study was performed to re-evaluate the options on offer.
Operations recommenced on site on 14 April 2008.
On 21 April 2008 Empyrean announced to shareholders that
"the well unexpectedly began to flow commercial quantities
of gas and condensate during operations to prepare the well for
a fracture stimulation and flow test programme". Initial
flows of 2.0 mmcfepd were measured which increased to 2.4mmcfepd
before the well was shut in to obtain pressure build up
measurements.
An acid fracc was successfully completed over a
900ft horizontal interval through five sets of perforations on
28 May 2008.
The operation resulted in a six fold increase in
deliverability. On 28 May 2008 Empyrean was able to report an
average gas flow of 2.5mmcfgpd accompanied by 950 bcpd and no
water through a 14/64" choke. This equates to approximately
12 mmcfgepd based on present gas and condensate prices.
On the same day the well was shut in to measure
pressure build up as part of the normal reservoir and production
engineering procedures. This well already has a sales line
connected to it enabling all production to be sold soon after
flowing.
TCEI JV Block A-2 well, located between the
Sugarkane discovery well and the TCEI JV Block A-1 well, is the
third well to be drilled in the 16 well deal. It is a vertical
well and may test any of the three Austin Chalk intervals that
were intercepted at Sugarloaf-1 well.
The TCEI JV Block A-2 well was spudded on 16
August 2007 and was in fact a re-entry of a well previously
drilled in 2006. In that well an electric wireline tool had
become stuck permanently and the TCEI JV Block A-2 was designed
to avoid the fish by drilling a directional leg.
A total depth of 12,084 ft was reached and 5
½" production casing set at 12,068 ft. Since then the well
has been used to monitor fraccing operations in the TCEI JV
Block A-1 well located to the south. During drilling, the gas
backround increased to 350 units in the Austin Chalk and this
zone will be fracced and tested, most likely after operations at
the TCEI JV Block A-1 are completed.
The TCEI JV Block A-3 well is the fourth well in
the 16 well deal and the third located in Block A in which
Empyrean is a participant. It lies southwest of the TCEI JV
Block A-1 well and has as its target the same producing interval
of the Austin Chalk that was intercepted at the Sugarkane No1
well gas-condensate discovery.
The well was spudded on 24 October 2007 and on
12 November 2007 reached a total depth of 12,457 ft in an 8
½" vertical pilot hole. Gas shows over a 185 ft interval
rose to a maximum of 350 units, almost 10 times the backround.
After electric logs were run the well was kicked off at 11,480
ft to begin horizontal drilling in the Austin Chalk reservoir. A
7" casing shoe was set at 12,272 ft.
During the horizontal drilling operation, three
sidetracks were made to precisely target high permeability pay
zones. The third and final sidetrack spanned 13,230 to 15,100
ft. Significant shows and flares were recorded while drilling
the entire 2,800 ft of open hole. The well continually tried to
flow despite the high mud weights being used. This persuaded the
operator to stop drilling at 15,100 ft, short of the original
17,800 ft, and attempt a natural open hole test. A plug was set
at the base of the 7" casing and the rig released and
replaced by a smaller and less expensive workover rig.
Workover operations commenced on 29 January
2008. The operator was forced to leave in the open hole a fish
made up of a length of 2 7/8" tubing and a 5 7/8" rock
bit. It is permanently lodged in the horizontal part of the open
hole in the interval 12,676 ft to 13,097 ft.
On 2 April 2008 a production packer was emplaced
in the 7" casing at 11,720' to begin the open hole testing
procedure. On 14 April 2008, Empyrean was finally able to
announce the initial test results of a significant
gas-condensate discovery. Initial flows through a 12/64"
choke were measured at 1.9mmcfgpd with 460 barrels of condensate
per day. Based on present day prices for gas and condensate this
would be equivalent to 6.6 mmcfepd.
This open hole test has been conducted without
stimulation. It compares favourably with other similar fields in
the region which exploit the Austin Chalk. The Brookeland Field
in Tyler County, for example, has an approximate equivalent rate
of 1.4 mmcfepd ("million cubic feet of equivalent per
day") per thousand feet of horizontal. The TCEI JV Block
A-3 well produces comparatively at 2.4 mmcfepd. A typical well
for one operator in the Brookeland Field has approximately
12,000 ft of horizontal with average initial rates of over 16
mmcfepd. The TCEI JV Block A-3 well provides evidence that
longer horizontal completions targeting the natural fracture
swarms that exist intermittently in the reservoir should result
in even better deliverability.
The TCEI JV Block A-3 well will be flow tested
then shut in as part of the normal reservoir and production
engineering procedure. During the shut in period the operator
will be supervising the construction of production facilities
and pipeline connection. Condensate will be separated in situ
and trucked to the appropriate markets.
SUMMARY
| Sugarloaf
Hosston |
EME
Interest |
Vertical
Well |
Horizontal Well |
Exploration
/ Production Status
|
| Total
Depth |
Pilot
Total Depth |
Total
Measured Depth |
BLOCK A
|
TCEI
JV
Block A-1 |
7.5% |
- |
- |
14,586
ft |
Well
commenced flowing commercial quantities of gas and
condensate, measuring 2.1mmcfepd. Well currently shut in to
test reservoir through pressure build up. |
TCEI
JV
Block A-2 |
7.5% |
12,084
ft |
- |
- |
Gas
present during drilling. Well currently being used to test
the TCEI JV Block A-1 well. Remains to be fracced and
tested. |
TCEI
JV
Block A-3 |
7.5% |
- |
12,457
ft |
15,100
ft |
Significant
gas condensate discovery occurred after testing in April
2008, with an expected capacity to produce 2.4mmctfgepd.
Well currently shut in to test reservoir through pressure
build up. |
BLOCK
B
|
| Sugarloaf-1 |
6% |
20,896
ft |
- |
- |
Initial
flows of gas and condensate declined, which resulted in the
well being shut in until Block A wells are completed so
information can be used to continue testing. |
| Kennedy-1H |
18% |
- |
- |
16,750
ft |
Gas
present during drilling. Further testing will commence once
results from the Block A wells are received. |
PARTNER
Texas Crude, a Houston based international oil
and gas exploration/production company, is the operator of the
Block B Sugarloaf Prospect